Business OIS
APQP with PFMEA, process flow and control plan linked together
Build the process flow, the AIAG-VDA PFMEA and the control plan as one linked set, so a change in one shows where the others need updating.
What it does
- APQP projects. Phases, deliverables and gates per part or project.
- AIAG-VDA PFMEA. Structure, function and failure analysis with action priority, in the AIAG-VDA method.
- Linked control plan. Characteristics and controls flow from the PFMEA into the control plan.
- Work instructions. Electronic work instructions linked to the operations they describe.
- Revisions. Locked revisions with history, so you can show what changed and why.
How it works
- Plan. Open the project and its phases.
- Analyse. Build the process flow and PFMEA with the team.
- Control. Release the control plan and work instructions to the floor.
More in Business OIS
MSA, SPC and PPAP
Gauge R&R, type 1 and attribute studies, SPC control charts with Cpk and Ppk, and PPAP submissions with the PSW in Business OIS.
See how it worksProblem solving (8D)
Run 8D problem solving from D0 to D8 in Business OIS: containment, 5-Why and fishbone root cause, corrective actions, effectiveness checks and the 8D report.
See how it worksSuppliers and customers
Approved supplier list, supplier scorecards, customer-specific requirements, customer scorecards and complaints linked to 8D, in Business OIS.
See how it worksSee Business OIS with a sample company
We walk you through every module using a fully set-up demo company, then answer your questions.