OIS Consult
Business OIS

APQP with PFMEA, process flow and control plan linked together

Build the process flow, the AIAG-VDA PFMEA and the control plan as one linked set, so a change in one shows where the others need updating.

What it does

  • APQP projects. Phases, deliverables and gates per part or project.
  • AIAG-VDA PFMEA. Structure, function and failure analysis with action priority, in the AIAG-VDA method.
  • Linked control plan. Characteristics and controls flow from the PFMEA into the control plan.
  • Work instructions. Electronic work instructions linked to the operations they describe.
  • Revisions. Locked revisions with history, so you can show what changed and why.

How it works

  1. Plan. Open the project and its phases.
  2. Analyse. Build the process flow and PFMEA with the team.
  3. Control. Release the control plan and work instructions to the floor.

See Business OIS with a sample company

We walk you through every module using a fully set-up demo company, then answer your questions.

WhatsApp us